Improvement and landscaping activities are being carried out in the area adjacent to Tsitsernakaberd Memorial Complex
Within the scope of a working visit Yerevan Mayor Taron Margaryan watched the process of improvement and landscaping being carried out in 108 ha are surrounding Tsistsernakaberd Memorial Complex prior to the 100th anniversary of the Armenian Genocide. Within the frames of the program of improvement the damaged parts of walkways are being restored, irrigation and gas pipes are being painted, the green zones are being cleaned up, lawns being refreshed and flowered.
The persons in charged reported the Mayor that the main road leading from Tsitsernakaberd highway to the Memorial Complex and the road leading from the Sport and Concert Complex to the Memorial had already been completely improved. The damaged kerbs along the roads had been renewed too. It was also reported that the external lighting throughout the area had been modernized, the benches had been painted, about 150 new dustbins had been placed. T was also noted that wheelchair ramps had been installed to make the area more accessible for people with locomotor disabilities, new marginal posts were placed to make to inside areas free from traffic.
Mayor Taron Margaryan instructed the persons in charge to keep the process of improvement under everyday control and to ensure timely implementation of the activities. Within the frames of the visit the Mayor was also shown the 21 new drinking water fountains installed in the area of the Complex. By the way, the installation of the drinking water fountains and the construction of two new WCs in this area were carried out by “Yerevan Jur” company.
Information and Public Relations Department
of the City Hall of Yerevan